ENGINEERED FLOORS

Blog Image

LPQ

LPQ is industrial press determined for gluing engineered flooring parquets. Machine consists of 2 gluing chambers and moveable glue sprader on the input. Gluing cycle is thanks to construction continuous. After pressurized chamber nr. 1 glue spreader moves on the second chamber. While workers are filling chamber nr. 2 material packet in the first chamber is pressurized and ready for next feeding. On the sides of the press there are dics conveyor tracks where the material is transported in front of the pressing chamber. Chamber is feeded from the side. Aligning of the layers is done by side moveable beams. When the packet in chamber is pressurized, all packet is lifted and it can be easily taked out from the machine.

Machine can be equipped by several pressing units and front aligning beams according the customer requirements.


| LPQ product leaflet | LPQ video

1 | TECHNICAL PARAMETERS


parameter value unit
machine length 2 600 / 3 000 / 3 500 mm
machine height 2 550 mm
machine width 1 580 mm
machine weight 3 000 - 5 000 kg
working length 2 600 - 3 500 mm
working height (packet height) 700 mm
max. working width (depth) 260 / 320 (optional 500) mm
number of working chambers 2 pcs
number of cylinders in each cahmber 15 - 21 pcs
cylinder pressure 4 000 (40) / optional 8 000 (80) kg (kN)
cylinder stroke 90 mm
working pressure 0 - 10 kg/cm2
number of front aligning beams 0 - 6 pcs
hydraulic pump power 3 / 4 kW
hydraulic pressure setting YES, on control panel directly
maximal pressure in hydraulic circuit 200 bar
hydraulic oil HM 46 12 - 20 liters
voltage 3x 400 V / 50 Hz

2 | MACHINE COMPOSITION


1 | MOBILE GLUE SPREADER - Through the glue spreader goes the bottom layer (usually plywood) which continues on the disc conveyors in front of the press chambers.

2 | PRESS - Workers feeds the press alternately with plywood bottom layers and top cover layers and then press all the packet together.

3 | OUTPUT CONVEYOR - After drying time expiry, packet is lifted and pulled out of the pressing chamber to the output conveyor where is taken to the next processing.




3 | MACHINE INSTALLATION